BUILDING INFORMATION
Park Lake Adare is the perfect location for exceptional acreage homes. Here, you will find all the building information you will need to start constructing your new dream home.
Disclosure Plans – Stage 1
Survey Plans Draft – Stage 1
Survey Plans Registered – Stage 1
Disclosure Plans – Stage 2
Survey Plans – Stage 2
Disclosure Plans – Stage 3
Survey Plans – Stage 3
Registration Confirmation – Stage 1
Building Covenant
Crossover Standard Spec For LVRC
Staging Plan
Conservation and Building Envelope Plan
Infrastructure Plan
Subdivision Layout Plan
Home Building Setbacks
Engineering (draft) – Stage 1
Development Permit for Operational Works – Stage 1
Draft Engineering Drawings – Stage 2
Stage 2 & 3 OPW submission – Civil Drawings
Stage 2 & 3 OPW submission – SWMP
Stage 2 & 3 OPW submission – DA
Stage 2 & 3 OPW – Approval
Stage 2 & 3 OPW Landscaping – Approval
Stage 2 & 3 Practical Completion Certificate
63 Redbank Creek Road Flood Management Report
174 Adare Road Flood Management Report
Bushfire Mitigation
Bushfire hazard assessment and mitigation plan
Bushfire Resilient Building Guideline
Minor Change approval
DA – Pages 1 to 48
DA – Pages 48 to 129
Approval & Drawings – Stage 1
Urban Utilities Approval for Stage 1 PLA
Water reticulation plans – Stage 1
Water reticulation sections – Stage 1
Water reticulation cover sheets – Stage 1
Lots with overhead power – Stage 1
Lots with overhead power – Stage 5
Electricity Reticulation
Telecommunication – Stage 1
Electrical – Stage 1
Electricity Reticulation (Preliminary) – Stages 2 & 3
Telecommunication (Preliminary) – Stages 2 & 3
Electricity-Reticulation-Design-Approval – Stages 2 & 3
Certificate for Electricity Supply – Stage 1
Amended Electricity Reticulation Design Approval – Stage 1
Practical Completion Certificate – Stage 1
Energex Certificate of Acceptance – Stage 1
Energex Certificate of Supply – Stages 2 & 3
Crossover Building Application
Before commencing the construction of a crossover, an application needs to be submitted to the local shire for approval. The application should be reviewed and approved by the shire before any construction work on the crossover begins. For your convenience, we have already provided a copy of the diagram and specifications for the crossover on our website.
Please complete the Application to Undertake Works on a Road and return to Council with all required additional information either by email to mailbox@lvrc.qld.gov.au, dropping off to a Council Office or by post.
Tree Removal Considerations
Removal of Trees and Vegetation may be subject to a permit, please contact Council and speak with the Planning Department to ascertain if a permit is required. Contact Council on 1300 005 872.
* Clear Obstruction: If a tree obstructs the planned location of your dwelling, driveway, or shed, it is advisable to exercise common sense, and in such cases, the tree may be removed.
* Boundary Trees: If you have any uncertainties regarding the removal of a tree located within the boundary of your property, we recommend reaching out to the Planning Department at the local shire for guidance and approval.
TIMING FOR STAGE DELIVERY
Residential land development can be prone to delays due to a number of factors that may include weather, material shortage or delays and other factors outside of the control of the developer. Equally, we rely on 3 levels of government to act in a timely diligent manner. The information below is subject to change without prior notice.
Completed
Completed
Completed
Completed
Commenced 3 October 2023
Practical Completion 15 May 2024
Estimated Commencement May 2024
To be advised
Estimated June 2024
To be advised